HomeBelmont CountyODOT anticipates Blaine Hill Bridge project to begin by 2027

ODOT anticipates Blaine Hill Bridge project to begin by 2027

BELMONT COUNTY, Ohio – The Ohio Department of Transportation (ODOT) provided the following update Wednesday on the closed Blaine Hill Bridge. The project is now called the U.S. Route 40 Blaine Hill Arches of Memory Rehabilitation.

The following is ODOT’s statement:

“The Ohio Department of Transportation (ODOT) Blaine Hill Arches of Memory Rehabilitation Project will rebuild the historic U.S. Route 40 bridge in Belmont County, Ohio.

The project includes enhancements to the structural integrity by replacing the superstructure and maintaining the bridge’s historical character, all to facilitate the bridge’s reopening.


The design plans for this vital project are in development. Michael Baker International is the firm designing it. ODOT anticipates construction to begin by 2027 but is actively working with the design firm to accelerate plan development.


Although funding is secured for this project, ODOT has submitted a grant application to the Bridge Investment Program for the Blaine Hill Bridge rehabilitation project for additional funding support. The Bridge Investment Program is one of the many available grants within the United States Department of Transportation’s Bipartisan Infrastructure Law.


District 11 Deputy Director Tom Corey said, “ODOT prioritizes safety above all else. We recognize that the closure is inconvenient for those living and working in the area and are making every effort to expedite the project. We want to ensure this work keeps this vital bridge in service to our community for decades to come.”


Built in 1932, the reinforced concrete bridge consists of four iconic arch spans. ODOT closed the bridge in 2024 due to substantial deterioration, including significant leaking and cracking on the deck and damage to the columns and concrete structure. The proposed rebuild will keep the bridge’s current width and speed limit, with minimal changes to the existing pedestrian facilities.


The Blaine Hill Viaduct is crucial in connecting the local communities of Blaine, Boydsville, Lansing, and Brookside. Rebuilding the bridge will restore connectivity for these communities and provide mobility options for local and regional freight and vehicular demand while preserving the historic bridge for future generations.


Preserving the bridge’s historical value while modernizing its function is critical to the project. The project will integrate durable materials such as advanced concrete sealants and resilient design elements that extend the bridge’s lifespan and protect its architectural integrity. These decisions will align with broader regional goals of maintaining vital infrastructure while respecting historic preservation.”

Karen Fatula-News Director
News Director for River News Network. Investigative journalist and Ohio Valley native with background in online, broadcast, magazine and newspaper media platforms. Graduate of E.W. Scripps School of Journalism at Ohio University.
Exit mobile version